NATM터널 정밀시공 불량에 따른 결함 및 개선사항
Poor Construction and its Improvement of Case Study in NATM Tunnel
추진호 ( Choo Jin-ho ) , 박시현 ( Park Si-hyun ) , 이유석 ( Lee Yu-seok ) , 윤태국 ( Yoon Tae-gook )

Defects Defects on tunnel lining have been analyzed in many inspection reports and research papers. However, it's not prevail upon feedback to design and construction yet. It is analyzed particular defects, such as crack, rebar exposal, leakage and asphalt pot hole, in 5 operational tunnels by constructed with NATM. Each defects is described with construction condition and analyzed the cause from Precise Inspection for Safety and Diagnosis by KISTEC. The aim of this study is to help making good integrity of tunnel in design and construction.