닫기
216.73.216.182
216.73.216.182
close menu
대형물류센터 PC부재 양중을 위한 크레인 궤적거리 산정 기초 연구
A Basic Study of Crane Trajectory Distance Calculation for Sustainable PC Members Erection of Large Logistic Building
임지영 ( Lim Jeeyoung ) , 오진혁 ( Oh Jinhyuk ) , 김선국 ( Kim Sunkuk )
UCI I410-ECN-151-24-02-088701717
이 자료는 4페이지 이하의 자료입니다.

As large logistics buildings have high floor heights and long spans, these buildings are designed as PC structures, and large cranes are used to lift PC members. PC erection planning can generally cause errors depending on the field engineer’s experience. To solve this problem, a basic analysis method is needed to establish a systematic PC member erection plan. Crane work can be minimized if the trajectory is easily and quickly calculated according to the location of the crane and applied to the site. Therefore, the objective of this study is a basic study of crane trajectory distance calculation for sustainable PC members erection of large logistic building. In this study, a crawler crane commonly used for lifting PC members is limited. The trajectory distance for the PC erection plan was automatically calculated using the algorithm.

[자료제공 : 네이버학술정보]
×