장경간 비정형 곡면 지붕층의 시공중 좌표 계측 사례 연구
Case Study of Coordinate Measurement during Construction of Long-Span Irregular Curved Roof Layers
심학보 ( Shim Hak-bo ) , 석원균 ( Seok Won-kyun ) , 박순전 ( Park Soon-jeon )
UCI I410-ECN-0102-2021-500-000599210
This article is 4 pages or less.

In this paper, it was tried to prove the possibility and effect of coordinate measurement by using MEP layout equipment at the construction stage, and to propose a method to improve measurement accuracy during construction. For this study, the passenger terminal site, which is a long span structure, was selected and compared with three dimensional CAD drawings and construction measurement results using MEP layout equipment for the precise construction of long-span irregular curved roof layers. As a result, it was found that it is possible to construct three-dimensional curved roof layers using MEP layout equipment through measurement and analysis.