1. CONTENTS
(1) RESEARCH OBJECTIVES
The purpose of this study is to analyze the order of priority to the institutional reform of multi-level replotting development projects.
(2) RESEARCH METHOD
This paper perform the preceding studies list up the reform points for the multi-level replotting development projects and survey the experts to check whether the list would be effective and utilized AHP(Analytic Hierarchy Process)Analysis for the results of the survey
(3) RESEARCH FINDINGS
Preceding studies have simply examined the refonn points for the multi-level replotting development project model, not specifying the elements of the system to be reformed or not setting priorities among them. Hence, their reform measures do not seem to be systematic.
2. RESULTS
This study offers method of institutional improvement for the multi-level replotting development projects. the results of this study can be summarized as follows; the areas of institutional reform(' supports for local inhabitants', 'local inhabitants agreemeent’, 'detailed criteria', 'institutional reforms', 'feasibility government') have a improvement necessity.