18.97.14.89
18.97.14.89
close menu
Accredited
초고압 송전선로 건설에 따른 토지보상에 대한 갈등과 개선방안에 관한 연구
A Study on the Conflict & Improvement with Construction of High Voltage Transmission Line in the Land Compensation
우문영 ( Woo Moon Young ) , 강정규 ( Kang Jeong Gyu )
부동산학보 vol. 53 201-211(11pages)
UCI I410-ECN-0102-2021-300-000373809

1. CONTENTS (1) RESEARCH OBJECTIVES In the run Korea Electric Power's policies raise incentives for people not; Stereotypical Let's ongoing construction projects this position repulsion due to strong opposition from residents halted the construction of what became the reason for investigation, analysis policy is to provide an alternative objective of this research was important. (2) RESEARCH METHOD In this study, transmission line construction projects smoothly without oppose the promotion of local residents to become, in many respects, been in need of improvement are considered,. Especially this study used to the crosstabulation analysis. (3) RESEARCH FINDINGS As you can see local residents oppose the construction of the transmission tower and transmission line because, due to construction of electrical towers falling land, destruction of landscapes, such as electromagnetic damage appears, the needs of these residents are not some of the locals to build transmission lines in every region of the country 're going to understand a phenomenon. 2. RESULTS Construction of transmission lines compared with the breakthrough in the area are more significant negative impact of local residents and interested parties to avoid the construction of transmission lines, so one-sided business readiness of Korea Electric Power Project should be avoided, Opinions residents by improving the way land compensation, especially for assessing the damage as possible to reflect residents' opinions should be. Second, that occurred in the construction process, residents living area, and appropriate compensation for pecuniary damages should be. Third, land and public works projects included in the term, but such projects are only due to electromagnetic interference and physical. The researchers of view, the construction of transmission lines in the business side and the conflict has just begun residents. The existing compensation scheme can not resolve these conflicts. Secret Sunshine, as well as in the construction of transmission lines are planned in other regions and the sharp social solidarity. May become a political problem continues.

Ⅰ. 서론
Ⅱ. 초고압 송전선로 건설 사업에 관한 이론적 고찰
Ⅲ. 초고압 송전선로의 토지보상 실태분석
Ⅳ. 초고압 송전선로 건설에 따른 토지보상의 개선방안
Ⅴ. 결론
<abstract>
<참고문헌>
[자료제공 : 네이버학술정보]
×