In this study, following works have been carried out : division of Nakdong River Basin into 25 sub basins, development of a technique to evaluate spatial distribution of rainfall and analysis of rainfall data of 169 stations, selection of control points, and selection of a hydrologic model(SSARR). The runoff analysis showed that the surface-subsurface separation and soil moisture index parameters are the most important two to the simulation result.