After the legal foundation for the Total Load Control System (TLCS) process is embedded in integrated water management
counterplan for 4 major river basins (1998), Kyunggido Kwangju City prepared the implementation plan of TLCS at first time. There is little difference between TLCS and TMDL(Total Daily Maxium Loading; U.S.A). TMDL is applied only when mandatory effluent limitations are not stringent enough to attain any water quality standard. But object of TLCS not only attain water quality standard at distributed watershed but also consider development of area at non-distributed watershed. For applying of systematic and consistent TLCS, we need to establish a system integrated watershed and point source, non -point source and assessed massive database easily. Now we are study on applicable possibility of BASINS on Korea, we think that BASINS's tool and many models are more easily apply to TLCS, so we recommend TLCS will be applied using BASINS.