닫기
18.97.9.170
18.97.9.170
close menu
}
Accredited
대구경 상수도관로의 경제적수명 산정 연구: P상수도 사례연구
A study on the economical life of large-diameter water pipe: case study in P waterworks
김기범 ( Kibum Kim ) , 서지원 ( Jeewon Seo ) , 최태호 ( Taeho Choi ) , 구자용 ( Jayong Koo )
UCI I410-ECN-0102-2018-500-003800459
* This article cannot be purchased.

This study develops a model to estimate the economic life of the large-diameter water supply pipeline in Korea by supplementing existing methods used to perform similar calculations. To evaluate the developed methodology, the model was applied to the actual target area with the conveyance pipe in P waterworks. The application yielded an economic life computation of 39.7 years, considering the cost of damages, maintenance, and renewal of the pipeline. Based on a sensitivity analysis of the derived results, the most important factor influencing the economic life expectancy was the predicted failure rate. The methodology for estimating the economic life of the water supply pipeline proposed in this study is one of the core processes of basic waterworks facility management planning. Therefore, the methods and results proposed in this study may be applied to asset management planning for water service providers.

[자료제공 : 네이버학술정보]
×