철근콘크리트 골조공사의 프로세스 및 공정 공백 산출 시뮬레이션 모형 개발
Development of Computing Model for the Process and Operation Interval of Reinforced Concrete Work using Web-CYCLONE
박상민 ( Sang Min Park ) , 손창백 ( Chang Baek Son ) , 이동은 ( Dong Eun Lee )
UCI I410-ECN-0102-2017-540-000336127
이 자료는 4페이지 이하의 자료입니다.

This study introduces a method for computation of process and operation gap in the specific construction operation(i.e., RC frame construction applying a block-grouping scheme) using CYCLONE-based simulation modeling and analysis technique. Since uncertainty of construction environment exists, a thoughtful production planning is required to effectively deal with a risk resulting in schedule delay in advance. This study presents the concepts of a time delay occurred in a process level and operation level in a operation model, and a method of measuring gap-times in each level while the simulation progresses. It helps a site manager to decide how many segmentation in a construction block is suitable for eliminating unproductive time-delays under the constrained resources (e.g., laborer, equipment). A case study presents a network model representing a three segmented RC frame work, and result obtained from the simulation experiment.

[자료제공 : 네이버학술정보]
×