다양한 예측기법을 이용한 현장타설말뚝의 최적길이 산정
Estimation of Optimum Pile length Using Various Prediction
최영석 ( Young Seok Choi ) , 임형준 ( Hyung Joon Iim ) , 송명준 ( Myung Jun Song ) , 장학성 ( Hak Sung Jang )
UCI I410-ECN-0102-2015-500-001862080
* 발행 기관의 요청으로 이용이 불가한 자료입니다.

As plan connecting island to island or island to land is needed, a lot of long-span bridge is being designed lately in Southern part of Korea. With development of pile equipment, overhanging large-scaled concrete pile are adopted to foundation type of main tower or pylon. About the number of 15~30 group piles per tower foundation is designed to resist long-spaning super-structure load, but by restricted condition of site investigation cost, a few boring-hole tests are performed to identify sub-ground layers. Up to now, direct-curved method connecting two or three known boring logs and representative interval method are usually used to evaluate unknown depth and rock properties at locations where piles are constructed. Because this approach is not logical and so rough, much difference occurs between designed length of piles and real length of it. In this paper, using a lot of various prediction method(reciprocal distance method, inverse square distance method and kriging method etc.), we suggest optimum length of group piles.

[자료제공 : 네이버학술정보]
×