18.97.14.83
18.97.14.83
close menu
7변수대수선형모형을 이용한 낙동강유역 BOD, COD, TOC 추정
Estimating BOD, COD and TOC in Nakdong River Basin Using 7parameter Log Linear Model
이정훈 ( Jeong Hoon Lee ) , 강임석 ( Lim Seok Kang ) , 김상단 ( Sang Dan Kim )
UCI I410-ECN-0102-2012-530-003295245
This article is 4 pages or less.
×