18.97.9.169
18.97.9.169
close menu
환경영향평가중 삼림생태계 평가기법 개발 ( I ) : 지리산 산청 양수발전소 건설예정지를 중심으로
Development of Forests Ecosystem Assessment Technique of Environmental Impact Assessment ( I ) : In the Case of the Sanchong Pumping - up Power Plant of Mt . Chiri
최송현 , 이경재 ( Song Hyun Choi , Kyong Jae Lee )
UCI I410-ECN-0102-2009-530-007164460

In order to develop an appropriate set of criteria applicable for environmental impact assessment (EIA) of natural forest 8 items are proposed. The criteria are vegetation distribution area (DA), distribution pattern (DP), size (S), diameter of breast height of tree (DBH), humus (H), sustainment (ST), successional stage (SS) and impact of adjacent ecosystem (IAE), Each criterion has an interval which minimum 1 score to maximum 5 score Forest Evaluation Index (FEI) was obtained as the sum of 8 criteria value. Above 70% is considered to be absolutely conservative and from 50% to 70% range of total score is to be considered conservative. In the case of the Sancho˘ng Pumping-up Power Plant of Mt. Chiri, 8 criteria were applied base on actual vegetation map. Pinus densiflora community got 73%(29 scores) and Quercus variabilis - Q. serrata community got 60% (24 scores). This may be said that this local vegetation has high ecological potentiality. These criteria cannot always be absolutely evaluation tool. So it is expected to take the more time to be developed further, and holistically added by the other field such as fauna, geological feature etc.

[자료제공 : 네이버학술정보]
×