설계시공일괄입찰공사의 설계변경 클레임요인 분석에 관한 기초 연구
Preliminary Study on the Factors Analysis of Change Order-Claim in Design-Build Project
류혁준 ( Hyeok Jun Ryu ) , 박병주 ( Byung Ju Park ) , 유승규 ( Seung Kyu Yoo ) , 김주형 ( Ju Hyung Kim ) , 김재준 ( Jae Jun Kim )
UCI I410-ECN-0102-2017-540-000335473
이 자료는 4페이지 이하의 자료입니다.

Although the order of Design-Build is being expanded by increasing construction scale and demanding hybrid function, the suitable regulation of the contracts is not settled. Design-Build is way by government because there are big construction of much government leading in contract relation high position occupy. So, case that prebendary’s claim institution develops by litigation is very rare. But, recently Design-Build is magnified. So, these dispute factors is becoming visualization gradually. The contract system is needed to be consistent by international standard to deal with the problem. This study suggests the useful solutions in detail concerned with the main factor of change order claim by each Design-Build phases through practical sorting and analysis of the causes of Change Order-Claim.

[자료제공 : 네이버학술정보]
×